Company Background
What types of wet wipes machines do you make?
We manufacture all types of CE Marked full automated wet wipes machines that are categorized into 4 types:
(1) Single Sachet Wet Wipes Machine
– Model: DH-250
(2) Cross Fold Wet Wipes Machine (5-40Pcs/Pack)
(3) Flow Pack Wet Wipes Machine (20-120Pcs/Pack)
-Model: UT-BL10(12); UT-BM16(20);UT-BH40
(4) Canister Wipes Machine
-Model:DH-FP

Please check our wet wipes machine product page (Click to view) and send inquiries to our sales specialist at [email protected] for detailed quotation on specific model.
Do you produce wet wipes machines in-house or are they outsourced?
Are you a wet wipes machine manufacturing factory?
All of our wet wipes machines are produced in-house by a dynamic team of savvy engineers and assembly workers who have been solely devoted to this filed for 10~20 years.
Moreover, we are proud to own the biggest machining workshop among our peers that boasts 6 lines of CNC producing 85% mechanical spare parts in-house. (Only basic parts like bearings, screws are outsourced.)

( wet wipes machines under manufacturing)
Click to see our factory view in video: Droid Wet wipes machinery Production site

(CNC Machining Center)
Where is your wet wipes machine manufacturing factory located?
Our wet wipes machine factory is located in Zhengzhou City, Henan Province.
It’s a city where top performance high-tech talents & high precision machining supports are more accessible.
Can I come to your factory to observe wet wipes machine running?
On-site wet wipes machine running is available for observation should you book appointments with our sales representatives ( [email protected]) and advise your itinerary at least 10 days before your visit.
We will arrange a pick-up from where you arrive in Zhengzhou to Our factory.

Zhengzhou City is 2-hour-flight from Shanghai city or 2.5-hour-flight from Guangzhou city.
How to reach Zhengzhou city?
(1) By air
The Nearest airport to our factory is Zhengzhou XinZheng International Airport. (25-minute-drive to Our factory)
(2) By Train
If by chance you are traveling within China, you could take high-speed trains from any inner cities of China to Zhengzhou Dong station. (45-minute-drive to our factory).
What makes DROID unique in the wet wipes machine industry?
We do what other wet wipes machine vendors can not do.
Droid’s Exclusive Market Positioning:
Droid is the only one in China who is solely devoted to and focused on disposable wet wipes machinery manufacturing & Turn-key project planning.

Throughout our initial journey of wet wipes machines manufacturing, a great many clients presented their challenges of venturing into modernized wet wipes production with well-informed & all-round guidance from building design support to wet wipes raw material selection.
This demand corresponds just with what we are capable of and gradually turned our vision to be solely devoted to first class wet wipes machinery manufacturing & turn-key wet wipes project planning.
And we are the only one capable of doing so in China. (Click here to see our project case)
This set vision drives us to make joint ventures with manufacturers of wet wipes raw material such as spunlace nonwoven, laminates packaging film and re-sealable labels with an aim to provide all customers need for an easy wet wipes production, helping them truly succeed in wet wipes business.
Our passion lies in helping start-ups grow from “Zero to One”, empowering veterans to leap from “Good to Excellence” in wet wipes business.
And I am proudly to say no one can do better than what we do in this field.
Why should I buy wet wipes machines from DROID?
What is the distinctive features of your wet wipes machine compared with other cheaper offers?
If you have the idea about the total cost of ownership on a wet wipes machine, I would say our machine has smaller TCO justified by below reasons:

- The precision of all our spare parts’ processing & assembly is almost 5 times than that of other vendors who offer a much lower cost;
- The design of our wet wipes machines is in compliance with FDA norms in terms of hygienic requirement, operational safety and running noise; (If you look closer at the running noise particularly you will see the difference easily)
- Our machine adopts all Mitsubishi CPU control system for higher accuracy and stability operation; (They use PLC at the best)
- It’s rare to find any of our second hand machine on the market;
- Our wet wipes machine is able to produce quality products consistently at promised high speed;
- Our wet wipes machine is able to run non-stop 24 hours with
- Our machine is able to serve Top brand’s critical demand for minimum deviation on tissue size& unit weight;
- We strive to help you achieve maximum capacity utilization and reduce reliance on labor work.
- Our machine offers minimum cost-to-use. It is durable to run for up to 10 -15 years.
- Wearable spare parts hardly seen & you do not need to replace critical parts on a frequent basis.
- Overall, our UT-series machine is of at least 30%-50% higher value than other machines.

Machines of similar functions do not hold same value.
Details are in quality.
What is your exclusive offer that we can not get from other wet wipes machine suppliers?
Here is What we can offer exclusively:
- State-of-art wet wipes converting & packaging machine manufacturing
- Selected Wet wipes raw material supply
- FDA GMP standard clean room design & construction

Have you sold any machine overseas?
We entered global market in 2018 with most overseas customers coming from markets where wipes are in soaring demand such as U.S.A, Malaysia, Thailand, Indonesia, India, Pakistan, Russia, Japan, South Korea, Turkey, Brazil, Mexico, UAE, Ukraine, South Africa, Ethiopia, Egypt, , Sri Lanka, Kenya etc.
With our global marketing channels expanding, we are looking forward to having more international players join us and become our happy customers like the ones shown in below image.

Let DROID be part of your future success in wet wipes business.


Are your wet wipes machine CE Marked and Certified?
Our wet wipes machines are CE certified with the certification issue by authorized EU notified body.

You can contact our notified body TUV Austria for validation if needed.
Note that not a single Chinese agency is authorized to conduct Conformity assessment to issue CE.
All CE that come under Chinese agencies letterhead are invalid.
Product & Service
How much does a wet wipes machine cost?
Buying a wet wipes machine is a lot like buying an automobile.
In general, a wet wipes machine can cost $20,000–$500,000 upfront depending on a wide range of factors including technology, capacity speed, functions & features, components, automation & intelligence and workmanship (machine finishes).
Keep in mind that there are two things to consider when evaluating the cost of a wet wipes machine:
-
The initial purchase price of the wet wipes machine
What you pay upfront when you buy it. This includes the wet wipes machine itself plus all the accessories.
-
The lifetime cost of ownership associated with the wet wipes machine
The Total cost of ownership on a wet wipes machine includes everything you spend after the purchase including any replacements, repairs, operational costs and maintenance.
Want to know how much exactly your desired wet wipes machine might cost? Send inquiries to [email protected] to request a detailed quotation.
What are the machines I need to buy in order to produce ready-for-sale wet wipes ?
You need to understand the typical wet wipes production process in order to get the answer:
A typical wet wipes manufacturing work flow entails 4 processes :

- A complete automated production line=
Wet wipes converting machine + wet wipes packaging machine + wet wipes lid applicator (Optional).
How Can I get a quotation?
Call us at +86-15659726323 or send inquiries to [email protected] and someone will be happy to assist you!
Is there one wet wipes machine that can make all types of wet wipes?
Generally speaking, there is no one-size-fits-all wet wipes machines.
You can not expect to get a wet wipes machine that can make all types of wet wipes at different sizes/ specs.
Wet Wipes can be divided into three categories by its applications:
- Personal care wipes include baby wipes, hand sanitizing wipes, makeup removal wipes, facial cleaning wipes, body cleansing wipes , feminine hygiene wipes, medical wipes., flushable toilet wipes.
- Household wipes include wipes for general purpose home care- surface disinfecting wipes, floor cleaning wipes, kitchen cleaning wipes, toilet cleaning wipes, automotive car cleaning, lens cleaning wipes, and shoe polishing wipes.
- Commercial/ industrial wipes include general purpose wipes, speciality(Degreasing / Machinery cleaning wipes)wipes for food service and healthcare sector.
However, if you come to a wet wipes machine manufacturer with a request for machines intended for a specific application, you probably will get nowhere.
Wet wipes machines are commonly categorized by its work flow into 4 types:
(1) Single Sachet Wet Wipes Machine
– Model: DH-250
(2) Cross Fold Wet Wipes Machine (5-40Pcs/Pack)
(3) Flow Pack Wet Wipes Machine (20-120Pcs/Pack)
-Model: UT-BL10(12); UT-BM16(20);UT-BH40
(4) Canister Wipes Machine
-Model:DH-FP

Please check our wet wipes machine product page (Click to view) and send inquiries to our sales specialist at [email protected] for detailed quotation on specific model.
Can you supply us all the raw material for wet wipes?
Droid has make joint ventures with experienced manufacturers of wet wipes raw material such as spun-lace nonwoven, laminates packaging film and re-sealable labels with an aim to provide all customers need for an easy wet wipes production, helping them truly succeed in wet wipes business.

Don’t have time to sort through the endless raw material options?
We can do that for you.
Call at +86-15659726323 or mail to [email protected] to get detailed pricing on all the wet wipes raw materials.
Do you provide all the operations and maintenance manuals in English?

What about machine installation and commissioning? Would you send someone to our factory for machine installation and operation training?
Maximum of 2 DROID personnel will complete installation, commissioning and training one nominated technician at the Buyer’s premises max. in 7 days exclusive of the traveling time.
Travel, housing, and other logistics expenses are not included And shall be invoiced at actual cost to Customer.
Training is provided to all employees who are in contact with our equipment.
We aim for all employees to gain a full understanding of our equipment and its capabilities to un- leash its full potential.
Please specifically describe your warranty terms.
One -year warranty, with Long-term spare parts supply.
(Excluded from the warranty are problems due to accidents, misuse, misapplication, storage damage, negligence, or modification to the Equipment or its components. ALSO THE EASY BROKEN SPARE PART IS NOT INCLUDED IN THE GUARANTEE).
During this period of warranty, if there is something wrong with the machine, we are responsible to provide project for solving this problem at the soonest, and help customers to restore production as soon as possible.
As Per our past experience, we do the maintenance by video or by other forms of easy-accessible media instructions and it is not complicated to follow the video instruction for minor repairing. We are fully prepared for any after-sale problems.
How do you ensure quality of the machine before delivery?
Machines will be tested for their performance, speed and productivity in harsh conditions by final quality control teams before delivery.
A Factory Acceptance Test will be conducted for client’s approval in accordance with the agreed specification / Contract; all testing materials are to be supplied on free of charge DDP basis to DROID for this purpose.
What is the purchase procedure?
Let us specify the purchase procedure road map:
- Identify wet wipes product specifications you want to make.
- Finalize wet wipes machine models based on confirmed SKU specifications, budget frame and volume expectation.
- Define production space footprints after machine models confirmed.
If you have an existing factory layout you can also send us to [email protected]. We will help you select the matching machine models and make clean room design accordingly.
START WITH A CONVERSATION
Let’s connect for a quick conversation to see if we are the right fit for each other.
We promise to provide some helpful resources and point you in the right direction.